Member Center Electric Service Products Community Energy Saver Safety Home
Quick Links Pay Online Apply for Service Outages Storm Info Forms Community Links
Cape Hatteras EMC Electric Service
Electric Service Touchstone Logo
In This Section
Service Rules and Regs
Connect or Change Service
Disconnect Service
Rates Fees and Deposits
Meter Reading
Underground Service
Forms
Rates/Fees/Deposits
Schedule A - RESIDENTIAL SERVICE
Applicable to residential consumers for all uses in the home subject to established rules of the Cooperative.
Amount: Summer(May-Oct): Winter(Nov-April):
Basic Service Charge $20.00 $20.00
First 1,000 kWh per month: 10.08¢ 10.08¢
All over 1,000 kWh per month 14.6¢ 9.56¢
Monthly Minimum Charge: The minimum monthly charge shall be the Basic Service Charge.


SCHEDULE B - COMMERCIAL AND INDUSTRIAL LIGHTING AND POWER SERVICE
Applicable to consumers for commercial, industrial and three-phase service for all users, including lighting, heating and power subject to the established rules of the seller.
Amount: Summer(May-Oct): Winter(Nov-April):
Basic Service Charge $25.00 $25.00
Demand Charges(per kW):
First 15 kW $0 $0
All kW over 15 per month $7.95 $7.95
Energy Charges(per kWh):
First 2,000 kWhs per month 13.41¢ 10.59¢
All over 2,000 kWh per month 9.19¢ 6.88¢
Monthly Minimum Charge: The minimum monthly charge shall be the Basic Service Charge.


SCHEDULE SL - SECURITY LIGHT SERVICE
Light: Rate:
175-Watt mercury vapor lamp $9.60
100-Watt high pressure sodium vapor lamp $9.60
250-Watt high pressure sodium vapor lamp $17.60
400-Watt mercury vapor lamp $25.00
1000-Watt high pressure sodium vapor lamp 69.50
  • Security lights shall be furnished and installed by the Cooperative.
  • The Cooperative shall maintain and repair security lights during regular working hours only.
  • If a pole is needed for a light, the member shall be required to pay an additional monthly charge of $1.50 per pole.
  • Any consumer requesting service under this rate schedule must agree to continue service for a minimum of twenty-four months. Termination of service prior to the twenty-four month limit will result in payment to the Cooperative for the remaining term up to the twenty-four month period